Warehouse & Factory Roof Renovation & Replacement

Warehouse & Factory Roof Renovation Without Stopping Production

Secure your assets from chronic leaks without stopping production. We work in phases, protect the area below, and manage demolition waste transparently.

Minimal Downtime
24-Month Warranty
K3 Compliant
Warehouse & Factory Roof Renovation Without Stopping Production
RISK-FIRST
RISK-FIRST

RE-ROOFING NEED INDICATORS & RISKS

Structural Damage

Structural Damage

Severe screw corrosion or roof sheets becoming brittle/porous

Chronic Leaks

Chronic Leaks

Point repairs are no longer effective because the leak source is too widespread

Excessive Heat

Excessive Heat

Old insulation is damaged/falling off. Solar radiation penetrates directly into the work area

Incident Risk

Incident Risk

Leaks in sensitive areas (electrical panels/main machinery) threatening safety

METHODS
METODE

METHOD CHOICES BASED ON TECHNICAL EVALUATION

Total Replacement

Total Replacement

Dismantling all old roof coverings and replacing with a new system (including flashing & gutters). The most effective long-term solution

Over Roofing

Over Roofing

Installation of a new roof over the old roof with a spacer system. Minimal risk of leaks during work but adds structural load

Zone Replacement

Zone Replacement

Replacement only in areas experiencing severe corrosion/critical damage

MATERIAL

MATERIAL CHOICES

(Steel supplied by BlueScope)

FeaturesIndustrial StandardHigh DurabilityExtreme Protection
Thickness0.40 mm0.45 mm0.50 mm
TensileG550 (High Tensile)G550 (High Tensile)G550 (High Tensile)
CoatingAZ 100AZ 150AZ 200
ProfileTrimdeck / KliplokKliplokKliplok
ColorNaturalCOLORBOND® optionCOLORBOND® ULTRA option
TRIMDECK

TRIMDECK

  • Economical
  • Fast Installation
KLIP-LOK

KLIP-LOK

  • Seamless
  • Anti-Leak Technology
bajaringan pattern
Workflow
WORKFLOW

Renovation Workflow

Condition & Structure Survey
01

Condition & Structure Survey

Check purlin strength and identify obstacles (pipes/ducts)

Phasing Plan Preparation
02

Phasing Plan Preparation

Determine work area sequence to avoid disrupting production lines

Controlled Dismantling
03

Controlled Dismantling

Gradual lowering of old materials + daily housekeeping

Installation & QC
04

Installation & QC

New roof installation with instant leak control at every joint

Final Audit & Handover
05

Final Audit & Handover

Gutter cleaning, submission of BA, and warranty documents

SCOPE BOX
Scope of Work

LIMITS & SCOPE
OF WORK

Inclusion

Included (Inclusion)

  • Dismantle & lower old roof covering materials
  • Install new roof + flashing + accessories
  • Work area protection & daily work scrap cleaning
  • Complete QC & K3 documentation
Exclusion

Variable/Optional (Disclosed Early)

  • Disposal: Cost of transporting waste off-site (depending on volume & distance)
  • Structure: Purlin/truss repair if found porous (after roof is opened)
  • Access: Provision of Manlift/Scissor Lift if the area does not allow scaffolding
FAQ

FREQUENTLY ASKED QUESTIONS & OPERATIONAL MANAGEMENT

Contact Us

CONTACT FORM & ESTIMATION REQUEST